GOODMAN · HOME SERVICES
Landscaping, irrigation, trees, washing & seasonal care
Landscaping, irrigation, trees, washing & seasonal care
66 services · 6 categoriesThe minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Services
Lawns, planting and garden care. Scope and cost follow your site details.
18 servicesIndicative GOODMAN labour rate. Per m² of plot from 200 m²: basic planting and path layout; survey, visualisation and engineering extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of open plot: manual clearing and light topsoil levelling; minimum 100 m², stumps and machinery extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² seeding on prepared soil with light raking and rolling; minimum 100 m², soil preparation and irrigation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of supplied turf on prepared level soil: laying, trimming and rolling; minimum 100 m². Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of damaged lawn: clearing, loosening, overseeding and rolling; minimum 20 m², soil replacement extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² accessible lawn, one aeration pass; minimum 100 m², specialist machine hire extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² lawn: scarifying and collecting thatch on site; minimum 100 m², disposal and machine hire extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² level lawn up to 15 cm high: mowing and on-site collection; minimum 100 m², disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² lawn: application-rate selection and spreading supplied fertiliser; minimum 100 m², soil testing extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One sapling up to 1.5 m with a small root ball: hole in ordinary soil, planting and watering; mature trees extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² prepared flowerbed, up to 9 small plants; minimum 10 m², soil replacement extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² cleared bed: spreading mulch up to 5 cm deep; minimum 30 m², weeding extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of light trimming of an existing hedge up to 1.8 m high; minimum 10 m, planting and disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One gardener-hour of hand weeding; herbicides and disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One visit, up to 6 person-hours: leaves, low-shrub pruning and bed preparation; disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One visit up to 3 hours: inspect small planting beds and apply one treatment; products and lab tests extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One garden light on a prepared base connected to an existing cable; trench extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² decorative gravel on a prepared area: geotextile and spreading up to 5 cm; minimum 10 m². Labour only; materials and installed equipment extra.
Irrigation, rainwater drainage and site flood control. Estimated after site details.
13 servicesIndicative GOODMAN labour rate. Irrigation layout for a plot up to 200 m² and 4 zones, including flow sizing; survey and water-source design extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² irrigated lawn from 100 m²: shallow trenches, pipes, sprinklers and startup; water supply ready, pump station extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One accessible fault up to 2 hours, such as a joint or sprinkler; investigation under paving extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Startup or winterisation of a system up to 4 zones in one visit; compressor hire and repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of surface drip line with fixing and test; minimum 30 m, water feed extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One sprinkler on a prepared connection, including arc adjustment; minimum 2 units, trenching extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One controller up to 6 zones: connect existing wires, programme and test; new cable runs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of shallow drainage up to 0.5 m deep in ordinary soil, pipe laying and backfill; minimum 10 m, chamber and disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of French drain up to 0.5 m deep: trench, geotextile, pipe and gravel; minimum 10 m, outlet extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of stormwater pipe up to 110 mm in a prepared sloping trench; minimum 10 m, excavation and chambers extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied plastic chamber up to 1 m deep in a prepared pit: fitting and connections; concrete rings and excavation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of drainage channel on a prepared base, set to fall; minimum 5 m, paving removal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One compatible pump on existing pipes and power: replacement and startup; deeper well and new circuit extra. Labour only; materials and installed equipment extra.
Pruning, care and tree removal. Method depends on tree condition and access.
9 servicesIndicative GOODMAN labour rate. One small tree up to 4 m, light sanitary pruning from ground or ladder; disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Crown of one tree up to 4 m: formative pruning without major rejuvenation; disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One non-hazardous tree up to 4 m in an open area, sectioned on ground; stump, power-line work and disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One stump up to 20 cm diameter in accessible ordinary soil; grinding machinery and disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Inspection and one ground-access treatment of a tree up to 4 m; products, laboratory and repeat visits extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple support or brace for a young tree with accessible fixing points; complex aerial cabling extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One tree up to 8 m: limited pruning of an accessible crown section, up to 4 person-hours; lift and complex lowering extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One loader-hour collecting and loading branches; vehicle, trip and disposal charged separately. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² sparse brush and shrubs up to 1 m: cut and collect on site; minimum 100 m², stumps and disposal extra. Labour only; materials and installed equipment extra.
Façades, paving and outdoor structures. Cleaning method matched to the material.
10 servicesIndicative GOODMAN labour rate. Per m² accessible facade up to 3 m high, routine washing; minimum 30 m², chemicals and elevated access extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² open decking, routine washing without stripping; minimum 30 m², sanding and treatment extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² hard outdoor paving with ordinary dirt; minimum 30 m², paint and deep stains extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of one fence side up to 2 m high; minimum 30 m², rust removal and painting extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of a simple accessible roof: cleaning and gentle washing; minimum 20 m², specialist access and repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of accessible gutter up to 3 m high: debris removal and flushing; minimum 10 m, pipe dismantling extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² pool surround, routine wash with water protected; minimum 30 m², stubborn deposits extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² empty parking area: sweeping and ordinary dirt washing; minimum 100 m², oils and chemicals extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² local moss or efflorescence on an accessible surface: patch test and treatment; minimum 10 m², products and substrate repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² accessible solar panels: gentle cleaning to equipment requirements; minimum 20 m², repairs and specialist access extra. Labour only; materials and installed equipment extra.
Snow removal and seasonal preparation. Initial service area: Tbilisi; availability depends on address and weather.
7 servicesIndicative GOODMAN labour rate. Per m² level path, loose snow up to 10 cm, manually cleared aside; minimum 50 m², removal extra. Weather and location agreed. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² simple accessible roof, loose snow up to 20 cm; minimum 30 m², specialist access extra. Subject to weather and location. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One accessible eaves section up to 3 m long: local ice removal with area isolation; lift extra, weather agreed. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² cleared path, even deicer spreading; minimum 100 m², product and snow clearance extra; location and weather agreed. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One worker-hour loading collected snow; vehicle and disposal extra; attendance depends on location and weather. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One small house: drain accessible outdoor lines, isolate taps and basic checks, up to 6 person-hours; repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One small house: restart accessible outdoor lines and check for leaks, up to 6 person-hours; repairs and pool extra. Labour only; materials and installed equipment extra.
Closing entry points, protective screens and damage repair. Measures depend on the property.
6 servicesIndicative GOODMAN labour rate. One accessible opening up to 10×10 cm: clean and close with metal mesh or mortar; extermination extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² bird net in a simple opening up to 3 m high; minimum 10 m², elevated access and complex frame extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One accessible vent grille with protective mesh without restricting required airflow; duct cleaning extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of mechanical bird deterrent on accessible eaves up to 3 m; minimum 5 m, electrical systems and droppings cleanup extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of accessible gap up to 5 cm: cleaning and protective closure; minimum 5 m, elevated access and roof repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One local area up to 1 m²: restore simple lining or insulation; structural members and pest extermination extra. Labour only; materials and installed equipment extra.
A compatible weather seal
Mosquito screens, accessible grilles, hardware and small fixings.
2 servicesTell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
One task or a whole list