GOODMAN · HOME SERVICES
Decking, canopies, awnings, gazebos and terrace fittings.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Indicative GOODMAN labour rate. Per m² of low open deck: supports, joists and decking on a prepared site; minimum 15 m², no roof or railings. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of straight decking on prepared joists; minimum 10 m², base construction extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of local decking replacement on sound joists; minimum 2 m², structural frame extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² plan area of a simple wooden pergola, assembled on prepared supports; minimum 6 m², no roofing or drive. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² projected area of a simple canopy: supplied frame and sheet roofing; minimum 6 m², foundations extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied manual awning up to 3 m on a sound facade; electrical supply extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² floor area of a simple supplied wooden gazebo with lightweight roof; minimum 6 m², foundation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of supplied railing up to 1.1 m high on a prepared edge; minimum 3 m, section fabrication extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One outdoor luminaire connected to an existing point; new cable route extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of channel in a prepared sloping trench; minimum 5 m, outlet and excavation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Two coats on a prepared base with simple edges; falls and tiling extra. Labour only; materials, equipment and plant hire extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list