GOODMAN · HOME SERVICES
Windows, insulated glazing, glass partitions and balcony finishing.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Per m² of standard PVC unit in a prepared opening, fixings and installation joint; removal and reveals extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One standard glazing unit up to 1 m², accessible indoors; no work at height. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Hardware on one standard sash: remove, fit and adjust; intact profile. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of accessible installation joint up to 3 m high; minimum 5 m, facade repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² fitting supplied glazing on a prepared parapet; no frame manufacture or slab reinforcement. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of insulated wall or ceiling surface; glazing, heating and final finish extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of balcony floor area: simple wall/ceiling lining and floor laying; glazing and insulation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of supplied sill, trimming and fixing to a prepared base; minimum 1 m. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of supplied glass partition up to 3 m high; doors and glass fabrication extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of film on clean flat glass, minimum 3 m²; old-film removal extra. Labour only; materials and installed equipment extra.
Adjust the window mechanism
A compatible weather seal
Including roller blinds
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list